Transport-related development of day care centers “Mäusekiste” and “Sonnenstrahl” in Leipzig
The canal and shaft construction work is almost complete.
In addition to the construction of a road surface from asphalt concrete, the renewal of the sidewalks is also included
Concrete pavement provided.
Granite pavement drainage channels are said to be next to the
Water drainage loosen up the appearance of the functional traffic systems.
Free School Leipzig eV
At the moment there is a lot of construction going on in the outdoor facilities of the “Free School”.
For the construction of several retention systems, shaft infiltration and block trenches are built in order to be able to infiltrate the rainwater that occurs on the traffic areas with a time delay.
An entrance building at basement level with stairs and ramps is supposed to
Enable handicapped accessible access to the cafeteria on level 0.